## 13.0.1.5.0 (2020-04-09)
**Features**
- Show *Run MRP Multi Level* menu only to a specific new security group
*Run MRP Manually*.
([\#492](https://github.com/OCA/manufacture/issues/492))
## 13.0.1.4.0 (2020-03-26)
> - Add menu entry for planned orders
> - Add button to navigate from planned orders to linked manufacturing
> orders
> - Add action to convert planned orders to fixed
> - When changing the due date in a planned order the release date is
> recomputed
## 13.0.1.3.0 (2020-03-02)
- \[IMP\] Minor changes"
([\#470](https://github.com/OCA/manufacture/pull/470)).
- Planned Order release and due date become required.
- Add button to Product MRP Area to update MOQ from Supplier Info.
- Link Manufacturing Orders with Planned Orders.
- Allow Mrp Inventory Procure Wizard to be used from other models.
- Make MRP Inventory creation more extensible.
- Main Supplier computation (v13 requires explicit False definitions)
## 13.0.1.2.0 (2020-02-20)
- \[IMP\] Minor changes
([\#468](https://github.com/OCA/manufacture/pull/468)).
- Planned Orders become fixed on manual creation by default
- Released Quantity becomes readonly
- Add product reference if Planned Order name is not defined on bom
explosion
## 13.0.1.1.0 (2020-02-21)
- \[FIX\] Minor changes
([\#469](https://github.com/OCA/manufacture/pull/469)).
- Fix Main supplier computation in multi company
- Drop Triplicated field in search view
- \[IMP\] Minor changes
([\#463](https://github.com/OCA/manufacture/pull/463)).
- Show supply method on MRP Inventory
- Allow no-MRP users to look into Products
## 13.0.1.0.0 (2019-12-18)
- \[MIG\] Migration to v13.
## 12.0.1.0.0 (2019-08-05)
- \[MIG\] Migration to v12:
- Estimates as a forecasting mechanism is moved to a new module
(mrp_multi_level_estimate).
## 11.0.3.0.0 (2019-05-22)
- \[REW/IMP\] Rework to include Planned Orders.
([\#365](https://github.com/OCA/manufacture/pull/365)).
- \[IMP\] Able to procure from a different location than the area's
location.
## 11.0.2.2.0 (2019-05-02)
- \[IMP\] Able to run MRP only for selected areas.
([\#360](https://github.com/OCA/manufacture/pull/360)).
## 11.0.2.1.0 (2019-04-02)
- \[IMP\] Implement *Nbr. Days* functionality to be able to group demand
when generating supply proposals.
([\#345](https://github.com/OCA/manufacture/pull/345)).
## 11.0.2.0.0 (2018-11-20)
- \[REW\] Refactor MRP Area.
([\#322](https://github.com/OCA/manufacture/pull/322)):
- MRP product concept dropped in favor of *Product MRP Area
Parameters*. This allow to set different MRP parameters for the same
product in different areas.
- Menu items reordering.
## 11.0.1.1.0 (2018-08-30)
- \[FIX\] Consider *Qty Multiple* on product to propose the quantity to
procure. ([\#297](https://github.com/OCA/manufacture/pull/297))
## 11.0.1.0.1 (2018-08-03)
- \[FIX\] User and system locales doesn't break MRP calculation.
([\#290](https://github.com/OCA/manufacture/pull/290))
- \[FIX\] Working Hours are now defined only at Warehouse level and
displayed as a related on MRP Areas.
([\#290](https://github.com/OCA/manufacture/pull/290))
## 11.0.1.0.0 (2018-07-09)