Estimated costs in manufacturing orders
|
||||
=======================================
|
||||
With this module when a production order is confirmed, some analytic lines
|
||||
are automatically generated, in order to estimate the costs of the production
|
||||
|
||||
Thanks to this module, when a Manufacturing Order is confirmed, analytic lines
|
||||
are automatically generated in order to estimate the costs of the production
|
||||
order.
|
||||
|
||||
At the same time, the estimated allocation of materials, machinery operators
|
||||
and costs will be made.
|
||||
At the same time, the estimated allocation of raw materials, machine operators
|
||||
time and costs will be made as followed:
|
||||
|
||||
In materials case, an analytic line will be generated for each material to
|
||||
consume in the order. For operators imputation in each operation, it will
|
||||
be generated one line, so that the number of lines will be equal to the number
|
||||
of operators in the operation. In machines case, there will be created two
|
||||
analytic lines for each operation in the associated routing, one per hour cost
|
||||
and the other per cycle cost.
|
||||
* Raw Material cost: an analytic line will be generated for each material to
|
||||
be consumed in the order.
|
||||
* Operators time: One line will be generated for the time recorded by the
|
||||
operators in each operation, so that the number of lines will be equal to
|
||||
the number of operators in the operation.
|
||||
* Cost associated to machines: two analytic lines for each operation will be
|
||||
created in the associated routing, one for hourly cost and the other for per
|
||||
cycle cost.
|
||||
|
||||
It has also created the new menu option "Fictitious Manufacturing Orders to
|
||||
estimate costs". When a new MO is created and the new field "active" is equal
|
||||
to false, the MO will be considered as a fictional MO, what with can not be
|
||||
confirmed, and only is valid to estimate costs. To estimate costs will have to
|
||||
press the "Compute data" button in tab "Work Orders". These fictitious MO will
|
||||
have a different sequence.
|
||||
From the product form may create a fictitious MO.
|
||||
A new menu is available "Virtual Manufacturing Orders for cost estimation"
|
||||
where the user can managed virtual MO:
|
||||
|
||||
* When a new MO is created and the new field "active" is false, the MO will be
|
||||
considered virtual. It is only used for cost estimation and can not be
|
||||
confirmed.
|
||||
* To estimate the cost of the MO, the user has to press the button "Compute
|
||||
data" in the tab "Work Orders".
|
||||
* These virtual MO have a separate sequence number.
|
||||
* The user can create a virtual MO directly from the product form.
|
||||
|
||||