mirror of
https://github.com/OCA/manufacture.git
synced 2025-01-28 16:37:15 +02:00
35 lines
1.1 KiB
ReStructuredText
35 lines
1.1 KiB
ReStructuredText
Steps to follow to use Control Plans:
|
|
|
|
- create a list of Control Plans
|
|
- define levels of control for Control Pans
|
|
|
|
**Control Plan**
|
|
* Go to Quality Control
|
|
* From Test menu select Control Plan
|
|
* Create a Control Plan with a name, description and eventually with Free Pass flag checked
|
|
|
|
**Control Plan Levels**
|
|
|
|
- Option A
|
|
* Go to Quality Control
|
|
* From Test menu select Control Plan
|
|
* Select a Control Plan
|
|
* Add rows with quantity level, value to check, type of value
|
|
|
|
- Option B
|
|
* Go to Quality Control
|
|
* From Test menu select Control Plan Levels
|
|
* Create a new element selecting the Control Plan and filling other fields
|
|
|
|
**Inspection → Nonconformity**
|
|
* Go to Qaulity Control
|
|
* From Inspection menu select Inspection
|
|
* Open or create an Inspection
|
|
* On tab Nonconformity add a new line, or click «Add Nonconformity»
|
|
|
|
**Nonconformity → Inspection**
|
|
* Go to Management System
|
|
* From Management System menu select Nonconformity
|
|
* Open or create a Nonconformity
|
|
* On field Inspection select or create the relative Inspection
|