mirror of
https://github.com/OCA/manufacture.git
synced 2025-01-28 16:37:15 +02:00
7 lines
505 B
ReStructuredText
7 lines
505 B
ReStructuredText
Go to Manufacture -> Configuration -> Settings -> Component Operations.
|
|
Create a new Operation, select the desired outgoing operation and the desired incoming operation.
|
|
Then fill the Locations and Routes (check in the routes that are selectable for mo operations in the route page).
|
|
Once saved, go to the Manufacture Order and click on the button "Operate Component".
|
|
Select the desired product (lot if needed) and the operation wanted.
|
|
When Confirmed, in the MO will be linked the pickings/scraps done.
|