Commit Graph

12 Commits

Author SHA1 Message Date
BernatPForgeFlow
8acdef9cf6 [IMP] mrp_multi_level: Supply method computation for MRP Parameters
For each MRP Parameter, we will calculate its supply method based on the procurement rules path. We will go back in the rules until we find that the action is "buy" or "manufacture", or until the action is "Pull From" or "Pull & Push" and the supply method is "Take from Stock".

This means we will show what the latest rule is if we were to do a procurement. Although it would be possible that the final action does not end up being executed if stock already exists in one of the intermediate locations.
2024-03-26 08:57:58 +05:30
joan
99a8f83ff0 [MIG] mrp_multi_level: Migration to 16.0 2024-03-26 08:57:58 +05:30
Bernat Puig Font
f36e539ba6 [FIX] mrp_multi_level: Manage Kits in MRP Multi Level 2024-03-26 08:57:58 +05:30
NuriaXForgeFlow
9dd164cbd2 [FIX] mrp_multi_level: Fix case when Purchase Uom is different from Uom and PO in draft 2024-03-26 08:57:58 +05:30
Christopher Ormaza
6eb561e1c3 [15.0][MIG] mrp_multi_level 2024-03-26 08:57:58 +05:30
Lois Rilo
a0e7070dd0 [FIX] mrp_multi_level: Consider timezone of the warehouse to generate mrp inventory records. 2024-03-26 08:57:58 +05:30
davidborromeo
5d14c1f5c0 [MIG] mrp_multi_level: Migration to 14.0 2024-03-26 08:57:58 +05:30
Matt Taylor
2df002c917 [FIX] mrp_multi_level: Check BoM Line Attrs
add a call to mrp.bom.line._skip_bom_line() method
fixes #505
2024-03-26 08:57:58 +05:30
Lois Rilo
e1e5f42704 [13.0][MIG] mrp_multi_level 2024-03-26 08:57:58 +05:30
Lois Rilo
6de26bb868 [IMP] mrp_multi_level: black, isort 2024-03-26 08:57:58 +05:30
Lois Rilo
b582b1d1a1 [12.0][FIX] mrp_multi_level: when grouping demand, if supply and
demand moves have the same date it can happen that the supply is
effectively ignored if considered as staring move of the
grouping and there are more groups to be done after it.

A test case include in this fix depicts in detail the
the problem and ensures no regression.
2024-03-26 08:57:58 +05:30
Lois Rilo
6cea6211e4 [12.0][MIG] mrp_multi_level:
* You can know integrate with different forecasting mechanisms.
  As a consequence integration with stock_demand_estimate is moved
  to a new module (mrp_multi_level_estimate).
* As agreed by the authors, the module is re-licensed to LGPL-3.
2024-03-26 08:57:58 +05:30