Commit Graph

44 Commits

Author SHA1 Message Date
Jordi Ballester
a90e971e30 [mrp_multi_level][fix] allow to procure from planned orders 2024-12-04 09:42:25 +05:30
Lois Rilo
3519eaa966 [FIX] mrp_multi_level: Consider timezone of the warehouse to generate mrp inventory records. 2024-12-04 09:42:25 +05:30
Lois Rilo
2c324338e2 [14.0][FIX] mrp_multi_level: error with 3 step delivery.
If the destination moves do not include a MO, the mrp move end
up without a name that raises an error later. This can happen
with 3 setep delivery but also with in more cases in wich there is
a chain of stock moves.

We ensure that the variable `order_number` always have a value.
2024-12-04 09:42:25 +05:30
Lois Rilo
4ec44db0ea [MIG] mrp_multi_level: finish migration of test 2024-12-04 09:42:25 +05:30
davidborromeo
b133065846 [MIG] mrp_multi_level: Migration to 14.0 2024-12-04 09:42:25 +05:30
davidborromeo
957b50af16 [IMP] mrp_multi_level: black, isort, prettier 2024-12-04 09:42:25 +05:30
Jordi Ballester Alomar
62f54da323 [FIX] mrp_multi_level: when a bom has quantity multiplier, consider it 2024-12-04 09:42:25 +05:30
AaronHForgeFlow
64ff10eae0 [IMP]mrp_multi_level
* let third modules to choose wether to continue exploding or not

This is useful for subcontracting and potentially for other flows.
2024-12-04 09:42:25 +05:30
Matt Taylor
601a08265d [FIX] mrp_multi_level: Check BoM Line Attrs
add a call to mrp.bom.line._skip_bom_line() method
fixes #505
2024-12-04 09:42:25 +05:30
Núria Martín Xifré
0dffeaf492 [13.0][IMP] mrp_multi_level: index llc 2024-12-04 09:42:25 +05:30
hveficent
2a1c277c96 [IMP] mrp_multi_level:
* Stock Moves Domain moved to product mrp area
2024-12-04 09:42:25 +05:30
OCA-git-bot
da891f212a pre-commit update 2024-12-04 09:42:25 +05:30
Lois Rilo
88c28972bf [11.0][FIX] mrp_multi_level: origin for "mv" was never being set.
Also, improve mrp.move by using picking name if the move is part of a picking.

[13.0] set "mo" as origin also for material consumption moves.
2024-12-04 09:42:25 +05:30
hveficent
e8cbf54a8d [IMP] mrp_multi_level:
* Planned Order release and due date become required.
* Add button to Product MRP Area to update MOQ from Supplier Info.
* Link Manufacturing Orders with Planned Orders.
* Allow Mrp Inventory Procure Wizard to be used from other models.
* Make MRP Inventory creation more extensible.
* Main Supplier computation (v13 requires explicit False definitions).
2024-12-04 09:42:25 +05:30
hveficent
0da15fcd89 [IMP] mrp_multi_level: Minor changes
* Planned Orders become fixed on manual creation by default
* Released Quantity become readonly
* Add product reference if Planned Order name is not defined on bom explosion
2024-12-04 09:42:25 +05:30
hveficent
1bb0ef773c [IMP] mrp_multi_level: Show supply method on mrp inventory 2024-12-04 09:42:25 +05:30
Lois Rilo
8a17a4376f [13.0][MIG] mrp_multi_level 2024-12-04 09:42:25 +05:30
Lois Rilo
2c18d11916 [IMP] mrp_multi_level: black, isort 2024-12-04 09:42:25 +05:30
Lois Rilo
68701a99f4 [12.0][FIX] mrp_multi_level: when grouping demand, if supply and
demand moves have the same date it can happen that the supply is
effectively ignored if considered as staring move of the
grouping and there are more groups to be done after it.

A test case include in this fix depicts in detail the
the problem and ensures no regression.
2024-12-04 09:42:25 +05:30
Lois Rilo
3589f59b2a [12.0][FIX] mrp_multi_level: creating undesired planned orders.
add another exclude point at planned order creation.
2024-12-04 09:42:25 +05:30
Lois Rilo
d750aae31b [12.0][MIG] mrp_multi_level:
* You can know integrate with different forecasting mechanisms.
  As a consequence integration with stock_demand_estimate is moved
  to a new module (mrp_multi_level_estimate).
* As agreed by the authors, the module is re-licensed to LGPL-3.
2024-12-04 09:42:25 +05:30
Lois Rilo
82cd356a66 [11.0][MIG] mrp_multi_level: open MRP inventory screen if manually run 2024-12-04 09:42:25 +05:30
Lois Rilo
8ac88a4322 [11.0][IMP] mrp_multi_level: able to group demand estimates or to ignore them. 2024-12-04 09:42:25 +05:30
Lois Rilo
55b8703ea7 [11.0][FIX] mrp_multi_level: pass a context to exclude hook when exploding. 2024-12-04 09:42:25 +05:30
Lois Rilo
0fd2b35345 [11.0][IMP] mrp_multi_level: able to procure from a different location than area's. 2024-12-04 09:42:25 +05:30
Lois Rilo
4830795ff4 [11.0][REW/IMP] mrp_multi_level:
* Extract concept of planned orders from mrp.move.
* Fix error grouping demand when there is no supply for a the first day of grouping.
* Adapt tests.
2024-12-04 09:42:25 +05:30
Lois Rilo
3300880dea [11.0][IMP] mrp_multi_level:
* Able to run MRP only for selected areas.
 * Clean logging messages.
2024-12-04 09:42:25 +05:30
Lois Rilo
16c495ad49 [11.0][IMP] mrp_multi_level: be able to group demand when generating supply proposals 2024-12-04 09:42:25 +05:30
Jordi Ballester Alomar
4b1e05da41 Fixes, and add migration script 2024-12-04 09:42:25 +05:30
Lois Rilo
556f49e65f [11.0] mrp_multi_level:
* fix api.depends fields fro main supplier.
 * fix ordering and missing demo file in manifest.
 * Update README.
 * fix action_view* methods.
 * readd hook to exclude in mrp initialization
 * fix computation of qty available (it was considering several times sub-locations).
 * Remove contraint for outoing and incoming moves to be moved in/outside the company, they can be internal transfers.
 * mrp.moves visible with technical settings.
 * Show product and allow to search by it in mrp.inventory.
2024-12-04 09:42:25 +05:30
Jordi Ballester Alomar
6374b1ecac [11.0][mrp_multi_level] refactor mrp area 2024-12-04 09:42:25 +05:30
Jordi Ballester Alomar
6a7f86dd69 convert read_groups into sql queries due to issue with locale 2024-12-04 09:42:25 +05:30
Lois Rilo
b043ab0a3e mrp_multi_level: date_planned must be passed on as datetime. 2024-12-04 09:42:25 +05:30
Jordi Ballester Alomar
fa59cc4a88 mrp_multi_level:
* during bom explosion consider only stockable products in the BOM.
* add logo
* add rounding on application of stock demand estimates.
2024-12-04 09:42:25 +05:30
Lois Rilo
d88fa9fecd [11.0][FIX] Consider *Qty Multiple* on product to propose the quantity to procure. 2024-12-04 09:42:25 +05:30
Lois Rilo
4f168ea7cb [11.0][FIX] mrp_multi_level:
* calendar defined only in warehouse.
 * remove raw query.
2024-12-04 09:42:25 +05:30
Lois Rilo
de40d62221 [11.0][FIX] mrp_multi_level: the user and system locales could make the MRP run break. 2024-12-04 09:42:25 +05:30
Lois Rilo
b2c323f72d [11.0][UPD] mrp_multi_level: update README and manifest to OCA standards. 2024-12-04 09:42:25 +05:30
Jordi Ballester Alomar
be9a7a7e22 rename 'date_to_procure' to 'order_release_date' 2024-12-04 09:42:25 +05:30
Jordi Ballester Alomar
2ec080b891 add resource calendar to mrp area 2024-12-04 09:42:25 +05:30
Lois Rilo
dac98caa6f [11.0][IMP] mrp_multi_level: reduce qty to procure with each procure done. 2024-12-04 09:42:25 +05:30
Lois Rilo
5f01dcab14 [11.0] mrp_multi_level: cleanup:
* remove unneded methods
 * fix pylint
 * fix style
2024-12-04 09:42:25 +05:30
Lois Rilo
53130f08cd [11.0][IMP] mrp_multi_level: improve usability 2024-12-04 09:42:25 +05:30
Lois Rilo
1a6b3493c6 [11.0][REN] multi_level_mrp -> mrp_multi_level 2024-12-04 09:42:25 +05:30