Commit Graph

61 Commits

Author SHA1 Message Date
Lois Rilo
1c49c1fb43 [FIX] mrp_multi_level: readd extensibility hook
_should_create_planned_order hook was unnoticely removed in
33cf4af1ac as it was not needed
anymore in the base module. However it is still an extension point
that can be used.
2024-11-12 13:57:49 +01:00
Matt Taylor
f1c795f7c4 [FIX] mrp_multi_level: check for variant bom
fixes #1366

Using the _bom_find() method, we get the BOM with lowest sequence, whether it's a variant
BOM or a template BOM (no product_id).
2024-11-08 10:46:25 +01:00
Matt Taylor
19bf0298f8 [FIX] mrp_multi_level: fix kit/phantom planning
fixes #1362

Ignoring qty_available for phantom products prevents double counting the
qty_available of components.

Creating planned orders for phantom products is simpler than recursively
exploding phantom BOMs. This also makes it easier to analyze the planning data
generated by the MRP calculation.
2024-11-07 12:08:46 +01:00
Matt Taylor
5ddf7717d4 [IMP] mrp_multi_level: mrp cleanup performance
- Index the planned_order_id column on mrp.production model
- Delete from mrp.planned.order before deleting from mrp.inventory
2024-10-30 12:20:00 +01:00
JordiMForgeFlow
a32c519f72 [IMP] mrp_multi_level: hook for method to get rule 2024-07-31 08:42:02 +02:00
Jordi Ballester Alomar
efd9abc073 [IMP] mrp_multi_level: add hooks to improve extensibility 2024-07-30 09:50:58 +02:00
Alexandre Fayolle
0484184450 [IMP] mrp_multi_level: safety stock
When a product has a safety stock in an area, and the current stock is
below safety, but there are moves in the future, mrp_multi_level does
not compute an immediate action to get back to the safety stock.

This PR changes this behavior: when the mrp_moves are considered, before
processing the first move in the future, we insert a resupply action to
rebuild the safety stock.

We also add some refactoring in the process:

* add extension point on the wizard to compute the quantity to reorder
(so we can choose in a separate module whether to rebuild safety stock
or not)
* add extension point on the wizard to get the date at which the safety
stock must be rebuilt (defaults to today)
* make the code of the wizard symetric between the groupes and non
grouped configuration
2024-01-12 14:25:44 +01:00
Alexandre Fayolle
aadd0582ea [REF] mrp_multi_level: location management
Small refactoring adding a _get_locations method on product.mrp.area
which by defaults delegates the computation to the related mrp.area.

This enables extending a few things related to locations at the
product.mrp.area level.

Change the way `_get_locations()` work: don't return the list of child
locations, only the top-most locations, and then use the `child_of`
operator in the code that looks for locations.
2023-12-06 21:41:32 +01:00
BernatPForgeFlow
f5c014cb5c [FIX] mrp_multi_level: Correct main supplier when changing sequence in Vendor Pricelist
When we change the sequence order of the Vendor Pricelist for a product, we firstly fetch the vendors and then we change the sequence. Then, when changing a sequence we try to get the first supplier but we do not get the desired result.
Reordering the suppliers allows to always get the first supplier in the list.
2023-11-30 09:32:51 +01:00
AaronHForgeFlow
a6d51f804d [IMP] mrp_multi_level: access action 2023-11-15 15:25:36 +01:00
BernatPForgeFlow
803cb14434 [IMP] mrp_multi_level: Get BoM to explode
When exploding requirements or calculating supply method, we will consider the first active BoM taking into account the routes.
2023-04-26 15:20:33 +02:00
BernatPForgeFlow
a49664b19a [IMP] mrp_multi_level: Supply method computation for MRP Parameters
For each MRP Parameter, we will calculate its supply method based on the procurement rules path. We will go back in the rules until we find that the action is "buy" or "manufacture", or until the action is "Pull From" or "Pull & Push" and the supply method is "Take from Stock".

This means we will show what the latest rule is if we were to do a procurement. Although it would be possible that the final action does not end up being executed if stock already exists in one of the intermediate locations.
2023-03-02 13:06:03 +01:00
OCA-git-bot
609fcb608e Merge PR #954 into 15.0
Signed-off-by LoisRForgeFlow
2023-02-09 13:58:37 +00:00
BernatPForgeFlow
3058bb707c [IMP] mrp_multi_level: Add MRP Planner
For each MRP Parameter or for each Product in a MRP Area, we will be able to add a MRP Planner. Once this planner is set, he can filter himself in the MRP Parameters view, MRP Inventory view or MRP Planned Orders view.
2023-02-07 12:56:50 +01:00
Lois Rilo
e4d5f4971c [IMP] mrp_multi_level: better group operators
For initial OH, final OH and planned availability grouping with sum
does not provide any value, specially when grouping by product.
And avg though can be more interesting.

For demand and supply we could have more doubts and the sum can
make sense, so we keep it as is.
2023-01-26 13:04:11 +01:00
OCA-git-bot
c24817055b Merge PR #851 into 15.0
Signed-off-by LoisRForgeFlow
2022-09-23 11:39:48 +00:00
Bernat Puig Font
1403cd378e [FIX] mrp_multi_level: Manage Kits in MRP Multi Level 2022-09-20 09:26:08 +02:00
Bernat Puig Font
078094e217 [FIX] mrp_multi_level: Recompute main supplier in MRP Parameter if we change MRP Area 2022-09-16 13:41:48 +02:00
Lois Rilo
932df6ec05 [IMP] mrp_multi_level: Archiving a product should archive related MRP parameters 2022-03-18 12:11:09 +01:00
Lois Rilo
d56ac64702 [IMP] mrp_multi_level: enchance traceability with origin.
* keept description of planned orders verbose.
* make it translatable in most cases.
* while grouping demand include the product in the description.
* add `origin` field not mrp moves and planned orders. Fill it
  with top level demand origin.
2022-03-17 18:32:26 +01:00
Jordi Ballester
e8a0b6107e improve usage of planned orders. - The description of the planned order includes the topmost requirement that caused the planned order. This makes it easier to trace, for example, what planned orders has a given sales order generated. The description of the planned order is passed on to the Manufacturing Orders / Purchase Orders / Transfers as the origin, so it can be possible to search for PO's / MO's that were originated as a result of a given sales order, for example.
- The MRP Inventory tree view is improved so as to add a button to allow you to
  jump to the planned orders.
2022-03-17 14:57:25 +01:00
Lois Rilo
ef41e51882 [IMP] mrp_multi_level: allow to specify distribution LT 2022-03-02 09:27:29 +01:00
Bernat Puig Font
623af243b5 [14.0][FIX] mrp_multi_level: Get mrp_area company_id for supply method
Change from self.env.company to mrp_area_id.company_id to compute the supply method correctly in the area currently working.
2022-02-23 11:27:11 +01:00
Christopher Ormaza
ec93a5fe41 [15.0][MIG] mrp_multi_level 2022-01-25 09:57:03 +01:00
Christopher Ormaza
eb236f7888 [IMP] mrp_multi_level: black, isort, prettier 2022-01-25 09:38:58 +01:00
Jordi Ballester
e88e20ea69 [FIX] mrp_multi_level: allow to delete product.mrp.area records
Planned orders and mrp moves are mostly data that is regenerated every time
that the multi level mrp is run.
2022-01-25 09:38:58 +01:00
Lois Rilo
1e460e851c [FIX] mrp_multi_level: Consider timezone of the warehouse to generate mrp inventory records. 2022-01-25 09:38:58 +01:00
Lois Rilo
f05679c0b1 [IMP] mrp_multi_level: show main supplier in mrp inventory 2022-01-25 09:38:58 +01:00
AaronHForgeFlow
13972b93fd [IMP]mrp_multi_level
* let third modules to choose wether to continue exploding or not

This is useful for subcontracting and potentially for other flows.
2022-01-25 09:38:58 +01:00
Núria Martín Xifré
4362a4a74c [13.0][IMP] mrp_multi_level: index llc 2022-01-25 09:38:58 +01:00
Jordi Ballester Alomar
9718795305 fix error in _compute_order_release_date of mrp.inventory 2022-01-25 09:38:58 +01:00
hveficent
51fb73d8f5 [IMP] mrp_multi_level:
* Stock Moves Domain moved to product mrp area
2022-01-25 09:38:58 +01:00
Jordi Ballester Alomar
21b836987e Improving the management of planned orders:
* Add menu entry for planned orders
  * Add button to navigate from planned orders to linked manufacturing orders
  * Add action to convert planned orders to fixed
  * When changing the due date in a planned order the release date is recomputed
2022-01-25 09:38:57 +01:00
Lois Rilo
6be0698da5 [FIX] mrp_multi_level:
* remove unneded _rec_name.
* extend _name_search to be more inline with name_get.
2022-01-25 09:38:57 +01:00
Jordi Ballester Alomar
efa8b40dbc define a name_search strategy for the product_mrp_area 2022-01-25 09:38:57 +01:00
hveficent
416fa13203 [IMP] mrp_multi_level:
* Planned Order release and due date become required.
* Add button to Product MRP Area to update MOQ from Supplier Info.
* Link Manufacturing Orders with Planned Orders.
* Allow Mrp Inventory Procure Wizard to be used from other models.
* Make MRP Inventory creation more extensible.
* Main Supplier computation (v13 requires explicit False definitions).
2022-01-25 09:38:57 +01:00
hveficent
78423ae8ab [IMP] mrp_multi_level: Minor changes
* Planned Orders become fixed on manual creation by default
* Released Quantity become readonly
* Add product reference if Planned Order name is not defined on bom explosion
2022-01-25 09:38:57 +01:00
Lois Rilo
733614004f [13.0][FIX] mrp_multi_level:
* main supplier computation in multi company
* triplicated field in search view
2022-01-25 09:38:57 +01:00
hveficent
5211466da1 [IMP] mrp_multi_level: Show supply method on mrp inventory 2022-01-25 09:38:57 +01:00
Lois Rilo
71d6c4bb86 [13.0][MIG] mrp_multi_level 2022-01-25 09:38:57 +01:00
Lois Rilo
1df4ba9c0b [IMP] mrp_multi_level: black, isort 2022-01-25 09:38:57 +01:00
Jordi Ballester Alomar
502a865a83 add support for multi-company 2022-01-25 09:38:57 +01:00
Lois Rilo
6b5ae91df7 [12.0][MIG] mrp_multi_level:
* You can know integrate with different forecasting mechanisms.
  As a consequence integration with stock_demand_estimate is moved
  to a new module (mrp_multi_level_estimate).
* As agreed by the authors, the module is re-licensed to LGPL-3.
2022-01-25 09:38:57 +01:00
Lois Rilo
b533d52f67 revert unneded context addition 2022-01-25 09:38:57 +01:00
Lois Rilo
a33618b014 [11.0][FIX] mrp_multi_level:
* remove duplicated fields in view
* fix issue using this module together with procurement_auto_create_group.
2022-01-25 09:38:57 +01:00
Lois Rilo
ca71827f5f [11.0][IMP] mrp_multi_level: able to group demand estimates or to ignore them. 2022-01-25 09:38:57 +01:00
Lois Rilo
c4646afe5f [11.0][FIX] mrp_multi_level: fix supply method computation and add required fields. 2022-01-25 09:38:57 +01:00
Lois Rilo
ec429818b3 [11.0][IMP] mrp_multi_level: able to procure from a different location than area's. 2022-01-25 09:38:57 +01:00
Lois Rilo
5c0224896e [11.0][REW/IMP] mrp_multi_level:
* Extract concept of planned orders from mrp.move.
* Fix error grouping demand when there is no supply for a the first day of grouping.
* Adapt tests.
2022-01-25 09:38:57 +01:00
Jordi Ballester Alomar
a8056b28d2 Fixes, and add migration script 2022-01-25 09:38:57 +01:00