Commit Graph

13 Commits

Author SHA1 Message Date
JordiMForgeFlow
48e343cc42 [FIX] mrp_multi_level_estimate: adapt domain to search on child locations 2024-05-21 08:26:21 +05:30
BernatPForgeFlow
18a9147ca8 [IMP] mrp_multi_level_estimate: Stock moves from MO should always be considered
When we consider forecasts as the 'Indirect' demand, we should always keep considering the demand coming from Manufacturing Orders, as they are 'Direct' demand.
2024-05-21 08:26:21 +05:30
Lois Rilo
ea743c4b61 [REW] mrp_multi_level_estimate: remove unneeded dependency
Remove unneeded dependency to date_range and relicense to LGPL.
2024-05-21 08:26:21 +05:30
Lois Rilo
5b45127a9a [IMP] mrp_multi_level_estimate: Estimates and other demand sources strategy
Introduces a new concept to define the strategy to apply when estimates
coexist with other sources of demand.
2024-05-21 08:26:21 +05:30
Lois Rilo
79bbe7287e [FIX] mrp_multi_level_estimate: group_estimate_days smaller than date range.
Do not overstate demand, a test hightlights the issue being solved.
2024-05-21 08:26:21 +05:30
Lois Rilo
44b6c9f11a [15.0][MIG] mrp_multi_level_estimate 2024-05-21 08:26:21 +05:30
Lois Rilo
cb047d3767 [FIX] mrp_multi_level_estimate: rounding issue
Rounding should be done at the end of the calculation, using the daily
quantity already rounded can lead to errors.
2024-05-21 08:26:21 +05:30
Lois Rilo
0fd63868f6 [FIX] mrp_multi_level_estimate: do not overstate estimates
when group days of estimates is greater than the lengh of the date
range in the estimate, the estimate is overstated and can generate
unexpected result. Enhance help message to highligh this and
prevent it from happening.
2024-05-21 08:26:21 +05:30
NuriaMForgeFlow
940baa3052 [14.0][IMP] mrp_multi_level_estimate:do not require date ranges on stock demand estimates 2024-05-21 08:26:21 +05:30
ps-tubtim
8e6e52daf8 [IMP] mrp_multi_level_estimate: black, isort 2024-05-21 08:26:21 +05:30
Lois Rilo
9136804614 [12.0][UPD] mrp_multi_level_estimate: eficent rebranded to forgeflow. 2024-05-21 08:26:21 +05:30
Lois Rilo
96fe538f73 [12.0][FIX] mrp_multi_level_estimate: adapt to latest split of stock_demand_estimate module. 2024-05-21 08:26:21 +05:30
Lois Rilo
94bfa14a83 [12.0][ADD] mrp_multi_level_estimate 2024-05-21 08:26:21 +05:30