Commit Graph

65 Commits

Author SHA1 Message Date
Lois Rilo
7d5edc11e1 [FIX] mrp_multi_level: delete params on cascade when deleting product. 2024-12-03 09:50:46 +01:00
Lois Rilo
34d0a090ae [FIX] mrp_multi_level: when a product is a kit do not check rule
When you procure a kit, it doesn't matter what the route configuration
is on the product itself but on its children, so it is not needed to
check anything else but the BoM to assign the 'phantom' supply
method.

Also do not assign a BoM when the supply method is not phantom or manufacture.
2024-11-26 16:03:42 +01:00
Lois Rilo
323b3fe86e [FIX] mrp_multi_level: readd extensibility hook
_should_create_planned_order hook was unnoticely removed in
33cf4af1ac as it was not needed
anymore in the base module. However it is still an extension point
that can be used.
2024-11-12 13:58:39 +01:00
Matt Taylor
31f813af54 [FIX] mrp_multi_level: check for variant bom
fixes #1366

Using the _bom_find() method, we get the BOM with lowest sequence, whether it's a variant
BOM or a template BOM (no product_id).
2024-11-08 10:47:16 +01:00
Matt Taylor
3fd6036ca8 [FIX] mrp_multi_level: fix kit/phantom planning
fixes #1362

Ignoring qty_available for phantom products prevents double counting the
qty_available of components.

Creating planned orders for phantom products is simpler than recursively
exploding phantom BOMs. This also makes it easier to analyze the planning data
generated by the MRP calculation.
2024-11-07 12:09:36 +01:00
Matt Taylor
11fd97d590 [IMP] mrp_multi_level: mrp cleanup performance
- Index the planned_order_id column on mrp.production model
- Delete from mrp.planned.order before deleting from mrp.inventory
2024-10-30 12:56:06 +01:00
JordiMForgeFlow
ac7f04ca4a [IMP] mrp_multi_level: hook for method to get rule 2024-07-31 08:42:47 +02:00
Jordi Ballester Alomar
0240a7c901 [IMP] mrp_multi_level: add hooks to improve extensibility 2024-07-30 09:49:33 +02:00
AlexPForgeFlow
f19e5873f7 [IMP] mrp_multi_level: add MRP Area smart button on stock locations 2024-07-16 09:20:39 +02:00
JasminSForgeFlow
fa027b500d [MIG] mrp_multi_level: Migration to 17.0 2024-04-04 11:17:28 +05:30
JasminSForgeFlow
03d6936f5a [IMP] mrp_multi_level: black, isort, prettier 2024-03-26 08:57:59 +05:30
Alexandre Fayolle
5d5a8a717d [IMP] mrp_multi_level: safety stock
When a product has a safety stock in an area, and the current stock is
below safety, but there are moves in the future, mrp_multi_level does
not compute an immediate action to get back to the safety stock.

This PR changes this behavior: when the mrp_moves are considered, before
processing the first move in the future, we insert a resupply action to
rebuild the safety stock.

We also add some refactoring in the process:

* add extension point on the wizard to compute the quantity to reorder
(so we can choose in a separate module whether to rebuild safety stock
or not)
* add extension point on the wizard to get the date at which the safety
stock must be rebuilt (defaults to today)
* make the code of the wizard symetric between the groupes and non
grouped configuration
2024-03-26 08:57:58 +05:30
Alexandre Fayolle
9ee1c33d17 [REF] mrp_multi_level: location management
Small refactoring adding a _get_locations method on product.mrp.area
which by defaults delegates the computation to the related mrp.area.

This enables extending a few things related to locations at the
product.mrp.area level.

Change the way `_get_locations()` work: don't return the list of child
locations, only the top-most locations, and then use the `child_of`
operator in the code that looks for locations.
2024-03-26 08:57:58 +05:30
BernatPForgeFlow
b9eeb3c36e [FIX] mrp_multi_level: Correct main supplier when changing sequence in Vendor Pricelist
When we change the sequence order of the Vendor Pricelist for a product, we firstly fetch the vendors and then we change the sequence. Then, when changing a sequence we try to get the first supplier but we do not get the desired result.
Reordering the suppliers allows to always get the first supplier in the list.
2024-03-26 08:57:58 +05:30
AaronHForgeFlow
e2bb80a96c [IMP] mrp_multi_level: access action 2024-03-26 08:57:58 +05:30
BernatPForgeFlow
512217bab0 [IMP] mrp_multi_level: Get BoM to explode
When exploding requirements or calculating supply method, we will consider the first active BoM taking into account the routes.
2024-03-26 08:57:58 +05:30
BernatPForgeFlow
8acdef9cf6 [IMP] mrp_multi_level: Supply method computation for MRP Parameters
For each MRP Parameter, we will calculate its supply method based on the procurement rules path. We will go back in the rules until we find that the action is "buy" or "manufacture", or until the action is "Pull From" or "Pull & Push" and the supply method is "Take from Stock".

This means we will show what the latest rule is if we were to do a procurement. Although it would be possible that the final action does not end up being executed if stock already exists in one of the intermediate locations.
2024-03-26 08:57:58 +05:30
Lois Rilo
c6c1b90bfb [IMP] mrp_multi_level: better group operators
For initial OH, final OH and planned availability grouping with sum
does not provide any value, specially when grouping by product.
And avg though can be more interesting.

For demand and supply we could have more doubts and the sum can
make sense, so we keep it as is.
2024-03-26 08:57:58 +05:30
BernatPForgeFlow
262cb817c2 [IMP] mrp_multi_level: Add MRP Planner
For each MRP Parameter or for each Product in a MRP Area, we will be able to add a MRP Planner. Once this planner is set, he can filter himself in the MRP Parameters view, MRP Inventory view or MRP Planned Orders view.
2024-03-26 08:57:58 +05:30
joan
99a8f83ff0 [MIG] mrp_multi_level: Migration to 16.0 2024-03-26 08:57:58 +05:30
Bernat Puig Font
f36e539ba6 [FIX] mrp_multi_level: Manage Kits in MRP Multi Level 2024-03-26 08:57:58 +05:30
Bernat Puig Font
927ed2e4fc [FIX] mrp_multi_level: Recompute main supplier in MRP Parameter if we change MRP Area 2024-03-26 08:57:58 +05:30
Lois Rilo
214106e76c [IMP] mrp_multi_level: Archiving a product should archive related MRP parameters 2024-03-26 08:57:58 +05:30
Lois Rilo
3a24bc38f1 [IMP] mrp_multi_level: enchance traceability with origin.
* keept description of planned orders verbose.
* make it translatable in most cases.
* while grouping demand include the product in the description.
* add `origin` field not mrp moves and planned orders. Fill it
  with top level demand origin.
2024-03-26 08:57:58 +05:30
Jordi Ballester
726ccec7e8 improve usage of planned orders. - The description of the planned order includes the topmost requirement that caused the planned order. This makes it easier to trace, for example, what planned orders has a given sales order generated. The description of the planned order is passed on to the Manufacturing Orders / Purchase Orders / Transfers as the origin, so it can be possible to search for PO's / MO's that were originated as a result of a given sales order, for example.
- The MRP Inventory tree view is improved so as to add a button to allow you to
  jump to the planned orders.
2024-03-26 08:57:58 +05:30
Lois Rilo
648c120185 [IMP] mrp_multi_level: allow to specify distribution LT 2024-03-26 08:57:58 +05:30
Bernat Puig Font
34bbff9acf [14.0][FIX] mrp_multi_level: Get mrp_area company_id for supply method
Change from self.env.company to mrp_area_id.company_id to compute the supply method correctly in the area currently working.
2024-03-26 08:57:58 +05:30
Christopher Ormaza
6eb561e1c3 [15.0][MIG] mrp_multi_level 2024-03-26 08:57:58 +05:30
Christopher Ormaza
0695f56084 [IMP] mrp_multi_level: black, isort, prettier 2024-03-26 08:57:58 +05:30
Jordi Ballester
3e6fc56b99 [FIX] mrp_multi_level: allow to delete product.mrp.area records
Planned orders and mrp moves are mostly data that is regenerated every time
that the multi level mrp is run.
2024-03-26 08:57:58 +05:30
Lois Rilo
a0e7070dd0 [FIX] mrp_multi_level: Consider timezone of the warehouse to generate mrp inventory records. 2024-03-26 08:57:58 +05:30
Lois Rilo
af9af489f5 [IMP] mrp_multi_level: show main supplier in mrp inventory 2024-03-26 08:57:58 +05:30
AaronHForgeFlow
2192602527 [IMP]mrp_multi_level
* let third modules to choose wether to continue exploding or not

This is useful for subcontracting and potentially for other flows.
2024-03-26 08:57:58 +05:30
Núria Martín Xifré
6afbef1bb5 [13.0][IMP] mrp_multi_level: index llc 2024-03-26 08:57:58 +05:30
Jordi Ballester Alomar
29dc8eacd5 fix error in _compute_order_release_date of mrp.inventory 2024-03-26 08:57:58 +05:30
hveficent
11391ddcff [IMP] mrp_multi_level:
* Stock Moves Domain moved to product mrp area
2024-03-26 08:57:58 +05:30
Jordi Ballester Alomar
1c3ac9798a Improving the management of planned orders:
* Add menu entry for planned orders
  * Add button to navigate from planned orders to linked manufacturing orders
  * Add action to convert planned orders to fixed
  * When changing the due date in a planned order the release date is recomputed
2024-03-26 08:57:58 +05:30
Lois Rilo
6b9fa5ecd8 [FIX] mrp_multi_level:
* remove unneded _rec_name.
* extend _name_search to be more inline with name_get.
2024-03-26 08:57:58 +05:30
Jordi Ballester Alomar
acc26ba542 define a name_search strategy for the product_mrp_area 2024-03-26 08:57:58 +05:30
hveficent
ae95609b34 [IMP] mrp_multi_level:
* Planned Order release and due date become required.
* Add button to Product MRP Area to update MOQ from Supplier Info.
* Link Manufacturing Orders with Planned Orders.
* Allow Mrp Inventory Procure Wizard to be used from other models.
* Make MRP Inventory creation more extensible.
* Main Supplier computation (v13 requires explicit False definitions).
2024-03-26 08:57:58 +05:30
hveficent
13bab76498 [IMP] mrp_multi_level: Minor changes
* Planned Orders become fixed on manual creation by default
* Released Quantity become readonly
* Add product reference if Planned Order name is not defined on bom explosion
2024-03-26 08:57:58 +05:30
Lois Rilo
d150418014 [13.0][FIX] mrp_multi_level:
* main supplier computation in multi company
* triplicated field in search view
2024-03-26 08:57:58 +05:30
hveficent
1bd8a2cbe3 [IMP] mrp_multi_level: Show supply method on mrp inventory 2024-03-26 08:57:58 +05:30
Lois Rilo
e1e5f42704 [13.0][MIG] mrp_multi_level 2024-03-26 08:57:58 +05:30
Lois Rilo
6de26bb868 [IMP] mrp_multi_level: black, isort 2024-03-26 08:57:58 +05:30
Jordi Ballester Alomar
5096c85a0b add support for multi-company 2024-03-26 08:57:58 +05:30
Lois Rilo
6cea6211e4 [12.0][MIG] mrp_multi_level:
* You can know integrate with different forecasting mechanisms.
  As a consequence integration with stock_demand_estimate is moved
  to a new module (mrp_multi_level_estimate).
* As agreed by the authors, the module is re-licensed to LGPL-3.
2024-03-26 08:57:58 +05:30
Lois Rilo
1724bb2d5a revert unneded context addition 2024-03-26 08:57:58 +05:30
Lois Rilo
b134e48225 [11.0][FIX] mrp_multi_level:
* remove duplicated fields in view
* fix issue using this module together with procurement_auto_create_group.
2024-03-26 08:57:58 +05:30
Lois Rilo
e308751cd5 [11.0][IMP] mrp_multi_level: able to group demand estimates or to ignore them. 2024-03-26 08:57:58 +05:30